Brevet600 km · Toronto
Belleville Loop
Sat September 19, 2026 at 5:00 AM
Register
NOTE: The Rouge River bridge at 577 km is closed through 2026. If you want to ride this as a permanent before the route is updated, consult with the chapter VP to discuss alternate routing.
Registered
2 ridersAndrew B.
Marcus U.